BC 2026 Wave 2 – What’s Actually Changing in Manufacturing and Inventory

Reading Time: 5 minutes

Business Central 2026 Wave 2 started rolling out in October. This is version 29. Most of the noise around this wave is about agents, Copilot chat and reporting, and if you only read the marketing posts you could think nothing happened for manufacturing. That is not true.

In the Wave 1 post the two headlines were native Quality Management and the rebuilt subcontracting. Version 29 takes both and makes them practical for daily work, plus a few changes that planners and warehouse people will notice from the first week. If you followed my WIP article, some of the subcontracting part will sound familiar, now it is generally available.

At a Glance

AreaWhat changes in v29Who noticesCheck before the update
SubcontractingSetup guide, instructions on the PO, inventory put-aways and picksPlanners, purchasing, warehouseMove from the old worksheet to the Subcontracting app
Planning and productionReleased orders from Carry Out Action Message, calendar warnings, clickable BOM/routing errorsPlannersRetest the planning worksheet flow
TransfersDirect transfer posting per transfer route, also from warehouse locationsMulti-site warehousesDecide the posting method per route
Quality ManagementAutomatic passed/failed quantity, bin selection on disposition, error opens the blocking inspectionQuality, warehouseReview disposition setup
FlushingManual flushing without requiring pick is now mandatoryProduction, warehouseTest consumption at warehouse locations
IntegrationsMicrosoft pages can no longer be exposed as SOAP endpointsIT, MES and WMS integrationsFind any SOAP page endpoints still in use

Subcontracting: the Wave 1 Rebuild Becomes Practical

Wave 1 gave subcontracting item tracking and warehouse handling. Wave 2 fills the gaps around it. In online environments the old Subcontracting Worksheet now shows a notification that the new Subcontracting app replaces it, with an Install button.

  • Assisted setup. A Subcontracting Setup guide walks through company defaults (worksheet template, component costs, transfer lead time) and opens the pages for work centers, vendors, locations and subcontractor prices. The Work Center Card now opens Subcontractor Prices, Subcontracting WIP Entries and the Subcontractor Dispatch List directly.
  • Instructions follow the operation to the vendor. Subcontracting Comments on standard tasks and routing lines copy to the production order and become descriptive lines on the subcontracting purchase order. Routing attachments do the same when both Production Trx and Purchase Trx are turned on.
  • Inventory put-aways and picks. Locations with basic warehouse (put-away required, receipt not required) can now use inventory put-aways on subcontracting purchase lines, and inventory picks and return put-aways on WIP transfer orders.
Flow from routing to production order to subcontracting purchase order, with comments and attachments copied at each step, then splitting into the intermediate operation handled by a WIP transfer order with inventory pick and return put-away, and the final operation where the inventory put-away posts output and capacity. A warning note says attachments are not added to the vendor email automatically
Written once on the routing, the instructions reach the vendor without retyping. On basic warehouse locations, the put-away of the final operation is what posts output and capacity.

Practical take: attachments on the purchase line are not added automatically to the vendor email, you still need Add file from source document in the Email Editor. And a missing Subc. Location Code on the vendor now raises a warning, so setup errors show up before the first order, not during it. If you still run the old flow I described in Managing Subcontracting, plan the move to the app now, not in the last week of the update window.

Planning and Production Orders: Less Clicking

Small changes, but planners will see them on day one:

  • Released orders from planning. Carry Out Action Message on the Planning Worksheet now offers Released and Released & Print. No more firm planned first and then changing status order by order (more on the statuses in Production Order Statuses).
  • Calendar warnings. Calculate Work Center Calendar and Calculate Machine Center Calendar run from the card. The new Calendar Entries Available Until field turns to warning style when it is earlier than the work date.
  • Clickable certification errors. When a production order meets an uncertified BOM or routing, the error offers Show Production BOM or Show Routing.
  • Routing Link Code everywhere. Now visible on Planning Routing, Prod. Order Components and Prod. Order Comp. Line List, very useful when investigating flushing problems.

Practical take: the calendar field alone will save support calls. A scheduling failure in January because nobody calculated the calendar for the new year is one of the most common tickets in manufacturing clients.

Direct Transfers: One Rule per Route

Until now, one setting in Inventory Setup decided how every direct transfer posted. In v29 Inventory Setup holds the company default, each transfer route can override it, and the transfer order can still be changed while it is open. Direct transfers also work from warehouse-enabled locations, from inventory picks up to the full advanced warehouse process, with partial posting from the warehouse shipment.

Three boxes in sequence: Inventory Setup with the company default, Transfer Route with Direct Transfer Posting per location pair, and Transfer Order which takes the route value and can be changed while open. The order then posts either separate shipment and receipt documents or one Posted Direct Transfer
The most specific setting wins: order over route, route over company.

Practical take: for clients with a central warehouse and small satellite stores, this means real in-transit for the long routes and a one-step direct transfer for the short ones, without customisation.

Quality Management: Smoothing the Edges

The native extension from Wave 1 gets a round of usability work:

  • Assign to myself. Editing an unassigned inspection asks if you want to take it.
  • Passed and failed quantities are calculated when the inspection finishes, from Sample Size or the base quantity.
  • Disposition moves let you choose movement method, destination location and destination bin, with assisted bin selection.
  • Blocked transactions now name the inspection that blocks a sale or consumption, and you can open it from the error.

Practical take: the last point matters most. Until now a blocked consumption on the shop floor usually meant a phone call to the quality team to find which inspection was open.

Mandatory Change: Manual Flushing Without Requiring Pick

The feature update “Manual flushing method without requiring pick” is now mandatory and cannot be switched off. Anyone with warehouse-handled locations and components on Manual flushing should test consumption in a v29 sandbox, especially where users or customisations expect a pick to exist. The background is in Flushing Methods in Business Central.

Developer and AL Implications

  • SOAP on Microsoft pages is gone. Exposing a Microsoft UI page as a SOAP endpoint is no longer possible in v29. Older MES and shop-floor integrations are often built exactly this way, so check them before the update.
  • Indexes across table extensions. Developers can define indexes that span fields from a base table and its table extensions, and admins can turn SIFT indexes on and off. Good news for heavy production and ledger tables with extension fields.
  • Testing in pipelines. AL tests can now run from the command line and in CI/CD, and Page Scripting is generally available, useful for regression tests of planning and posting flows.

Before You Update

The v29 update window runs until February 2027. Create a sandbox on v29 and test at least the planning worksheet, one full production cycle with consumption, any subcontracting flow and the transfers between your main locations. On-premises customers on v24 or earlier must go through v25 first.

Summary

Wave 1 delivered the big manufacturing features. Wave 2 is the release that makes them usable: subcontracting gets proper setup, documents and warehouse activities, Quality Management loses its rough edges, and planners lose a few daily clicks.

Nothing here replaces a specialist MES or APS. But together these changes remove many of the small frictions that keep Excel open next to Business Central on the planner’s desk.

Resources


Testing v29 on a manufacturing tenant and found something that behaves differently? Get in touch.