A flour mill puts wheat in and gets three flour grades and bran out. A dairy makes cheese and whey from the same milk. A wire plant cuts coils into several gauges and some scrap. In all these cases one production run gives more than one saleable product, and the cost of the run is joint: you cannot say which part of the milk “belongs” to the cheese and which to the whey.
Business Central is built around one production order line, one output, one cost. In this post I explain the options you have in standard Business Central for co-products and by-products, where they stop, and which allocation methods make sense.
Co-product or by-product?
- Co-products are the main products of the process, with significant sales value each: the flour grades, the cheese.
- By-products are secondary outputs with small value compared to the main products: bran, whey sold for feed, scrap metal.
The difference matters for costing. Co-products share the joint cost. By-products usually do not get a share; their value is deducted from the joint cost as a credit, and the rest is split among the co-products.
What you can do in standard Business Central
Negative lines in the production BOM
The classic workaround for a by-product is a production BOM line with a negative quantity. When the order consumes the BOM, the negative line posts a positive entry for the by-product, at its unit cost, and that value reduces the cost of the main item. It is simple and it works for one by-product with a stable value.
The limits come quickly. The by-product enters stock at whatever unit cost it has, not at a value you decide. It does not work well for real co-products, because only one item carries the cost. And yield variances are mixed into the cost of the main item.
Several lines on one production order
You can also put each output as its own line on the production order. Then each line has its own BOM and routing, and Business Central costs each line separately. That is fine when the products really have separate inputs. For a real joint process it is not, because you have to split the materials and hours between the lines yourself, in advance, before you know the actual yield.
Outside Business Central
What most companies do in the end is a spreadsheet: take the total cost of the batch, split it by some key, and post revaluation journals. It works, but it is manual every month, and nobody can trace the split later.
The allocation methods
Whatever tool you use, you must choose how to split. These are the methods used in practice, and the ones that SAP and the process-manufacturing ERPs support:
| Method | Split by | When it fits |
|---|---|---|
| Physical measure | Kilos, litres, units of output | Products of similar value per unit |
| Sales value at split-off | Output quantity × selling price | Products sold as they come out of the process |
| Net realisable value | Selling price minus further processing and selling cost | Products that need more work after the split |
| Equivalence numbers | A fixed weight per product | Stable processes, the SAP way |
| Constant gross margin % | Same margin for every product | When you want comparable profitability |
| Market value, standard cost, manual | A price or a key you choose | Special cases |
An example. A batch costs €10,000 and gives 6,000 kg of product A sold at €2/kg and 4,000 kg of product B sold at €1/kg. By physical measure, A gets 60% (€6,000) and B 40% (€4,000), so B costs €1/kg and makes zero margin. By sales value at split-off, A is worth €12,000 and B €4,000, so A gets 75% (€7,500) and B 25% (€2,500). Same batch, very different product profitability. This is why the method must be a conscious decision, per product family, and not whatever the spreadsheet happened to do.
What a good solution needs
- The split uses the actual output quantities of each batch, not the planned ones.
- By-products are valued first (at NRV, standard cost, market price or zero) and their value comes off the joint cost.
- The posting goes through standard production orders, so item ledger, WIP, item tracing and G/L work as normal.
- After Adjust Cost each product sits at its share of actual cost, and yield variances are visible.
This is what I built in Co-Product & By-Product Costing: production formulas with several outputs, eight allocation methods, by-product credits, batch orders posted through standard production orders, and actual cost and yield variance per output when the batch is closed. It works in Business Central Premium without moving you to a full process-manufacturing suite.
Summary
- Standard Business Central handles a simple by-product with a negative BOM line, but not real joint costs.
- Choose the allocation method on purpose; it changes the profitability of every product.
- Value by-products first, split the rest across co-products, and use actual yields.

Director and Founder of GMSOFT, a Microsoft Dynamics partner serving the UK, Greece, and Italy. Microsoft Dynamics 365 Community Super User, Season 1 2026 — recognised for top-tier community contribution on Business Central manufacturing topics. Independent BC consultant with 15 years on Business Central and NAV (and 30 in ERP overall). Founder of two BC user groups: Business Central Greece on LinkedIn and Dynamics Business Central User Group Greece (Microsoft Community). Publisher of 3 apps on Microsoft AppSource (ABC Classification Manager, Vendor Dispute, BOM Architect) and open-source AL on GitHub (GmsoftLtd).